Having determined the energy requirements for Connect Monitor, the next step was to select the battery chemistry and construction. There are many, many different types of non-rechargeable battery available nowadays, each of which has their own pros and cons: it’s easy to get it wrong if you don’t carefully think through all the requirements. In our case, we wanted:
Part 2: Connect™ Monitor battery – design considerations for battery selection
Sep 2, 2020 4:59:55 PM / by AoFrio posted in Connect Monitor
Part 1: Connect™ Monitor battery – design considerations for the energy budget
Aug 26, 2020 10:22:01 AM / by AoFrio posted in Connect Monitor
Over our next two articles introducing the Connect Monitor, David Howell, Wellington's Chief Technical Officer tells us about the real-world design considerations for the Connect Monitor's battery, starting off with the energy budget.
As the labour cost of replacing a low-cost IoT device is significantly higher than the price of the device itself; the battery must deliver the longest possible life while also producing the best possible device performance under real-world conditions.
A sneak peek at the Connect Monitor
Aug 13, 2020 12:06:41 PM / by David Burden posted in Connect Monitor
Wellington Drive Technologies new ConnectTM Monitor is rolling out to selected field trial customers in August 2020. Over the next few blogs, we are going to introduce you to the many features of this versatile refrigeration IoT device.
If you would like some more information, or to speak with one of our team, please click here.
® is a registered Trade Mark of Wellington Drive Technologies Ltd
2020 Wellington Drive Technologies Limited
Wellington Offices
New Zealand (Head Office), Turkey, Mexico, US, Brazil, Italy, China, Singapore
E: info@wdtl.com www.wdtl.com